Streetlight Pedestal at Pad Mount Transformer
- Already an existing pad mount transformer
- The installation of the disconnect pedestal and service equipment must be performed by a licensed electrician hired by the party requesting the service
- The service conductor needs to run to transformer pad with appropriate wire size matching breaker in the disconnect, leaving a minimum of 5β of conductor exposed at the pad.
- Ground wire must be a minimum #6 CU
- Β½βx8β copper clad ground rod must be installed with a one-bolt ground rod clamp.
- The pedestal shall be located behind the transformer to one side and no more than 5β away.
- No plug-in outlets are allowed to be fed from pedestal
- Recommended disconnect is (Milbank U5200-xl or comparable unmetered enclosure with disconnect)
- Diagram (See exhibit C) 1. Pad mount transformer 2. Disconnect and service equipment 3. Service conductor 4. Ground Wire 5. Ground rod

(Exhibit C)
CONTACT US
Weβre available 24/7/365! If you need help with any of your NineStar Connect services, use the link below to get in touch.
CONTACT US