Streetlight Pedestal at Secondary Splice Box

  • Already an existing secondary splice box.
  • The installation of the disconnect pedestal and service equipment must be performed by a licensed electrician hired by the party requesting the service
  • The service conduct needs to run to secondary pad with appropriate wire size matching breaker in the disconnect, leaving a minimum of 5’ of conductor exposed at the pad.
  • Ground wire must be a minimum #6 CU
  • ½”x8’ copper clad ground rod must be installed with a one-bolt ground rod clamp.
  • The pedestal shall be located behind the spice box to one side and no more than 5’ away.
  • No plug-in outlets are allowed to be fed from pedestal
  • Recommended disconnect is (Milbank U5200-xl or comparable unmetered enclosure with disconnect)
  • Diagram (See exhibit D) 1. Secondary splice box 2. Disconnect and ser equipment 3. Service conductor 4. Ground Wire 5. Ground rod

(Exhibit D)

CONTACT US

We’re available 24/7/365! If you need help with any of your NineStar Connect services, use the link below to get in touch.

CONTACT US